We designed a scalable cold aisle containment system that enabled the client to support average rack loads of 7.7kW with peaks up to 11kW. A dual electrical distribution path was installed, using N+1 UPS to eliminate single points of failure.
Cooling was managed via chilled water systems with elevated temps, plus LPA-free cooling for stability. The design included 4 x 6MVA UPSs and a 36MVA generator set, all linked to secure SSE utility supply.
The installation was staged using “soft-landing” techniques to ensure seamless handover and zero disruption to ongoing operations.
24 MW of supported IT load
11 kW cabinet peaks delivered
Full redundancy through N+ 1 UPS
Zero downtime during switchover
25 MVA standby capacity
Reduced energy consumption through elevated chilled water design
From Ireland to international markets, we deliver complex, high-specification infrastructure with precision, performance, and consistency.
Gloster Global
Landscape House, Baldonnell Business Park, Dublin22, D22 P3K7.
Gloster Global
29 Great Guildford Street, London, SE1 0ES
Gloster Global
Taunusanlage 8, 60329 Frankfurt am Main
To provide sustainable MEP Solutions to a global community with an evolutionary mentality.