Slough Data Centre Refurbishment

Key Details

18 Months

18 Months

Project Duration

Confidential

Confidential

Project Client

24 MW

24 MW

Power Capacity

Phased Refurbishment

Phased Refurbishment

Programme Type

Project Overview

We designed a scalable cold aisle containment system that enabled the client to support average rack loads of 7.7kW with peaks up to 11kW. A dual electrical distribution path was installed, using N+1 UPS to eliminate single points of failure.

 

Cooling was managed via chilled water systems with elevated temps, plus LPA-free cooling for stability. The design included 4 x 6MVA UPSs and a 36MVA generator set, all linked to secure SSE utility supply.

 

The installation was staged using “soft-landing” techniques to ensure seamless handover and zero disruption to ongoing operations.

Scope of Services

Solutions

More Projects

Project Management

Malta

Design & Installation

WXT1

Electrical & Mechanical Works

India

Data Centre Development

FRA 11 A100

Installation
Installation

Rooted in Ireland, Trusted Internationally.

From Ireland to international markets, we deliver complex, high-specification infrastructure with precision, performance, and consistency.

Gloster Global

Landscape House, Baldonnell Business Park, Dublin22, D22 P3K7.

Gloster Global

29 Great Guildford Street, London, SE1 0ES

Gloster Global

Taunusanlage 8, 60329 Frankfurt am Main