Key Details

35 Weeks

35 Weeks

Project Duration

Confidential

Confidential

Project Client

56 MW

56 MW

Power Capacity

Infrastructure Installation

Infrastructure Installation

Programme Type

Project Overview

Gloster Global were deployed to deliver a critical infrastructure installation package for one of Europe’s largest data centres. The scope focused on implementing a robust two-tier ladder rack system across 28 data halls, spanning seven branches.

 

With a heavy-duty cabling requirement, the project demanded both engineering precision and seamless project coordination. Gloster’s role involved the design, installation, and termination of busbar systems and power feeds, incorporating integrated cable waterfalls, calibrated torque methods, and structured routing for maximum system integrity.

Scope of Services

Solutions

More Projects

Malta

Design & Installation

WXT1

Electrical & Mechanical Works

India

Data Centre Development

FRA 11 A100

Installation

FRA 11.2

Design & Installation
Installation

Rooted in Ireland, Trusted Internationally.

From Ireland to international markets, we deliver complex, high-specification infrastructure with precision, performance, and consistency.

Gloster Global

Landscape House, Baldonnell Business Park, Dublin22, D22 P3K7.

Gloster Global

29 Great Guildford Street, London, SE1 0ES

Gloster Global

Taunusanlage 8, 60329 Frankfurt am Main