

















Project Duration

Project Client

Power Capacity

Programme Type
Gloster Global were deployed to deliver a critical infrastructure installation package for one of Europe’s largest data centres. The scope focused on implementing a robust two-tier ladder rack system across 28 data halls, spanning seven branches.
With a heavy-duty cabling requirement, the project demanded both engineering precision and seamless project coordination. Gloster’s role involved the design, installation, and termination of busbar systems and power feeds, incorporating integrated cable waterfalls, calibrated torque methods, and structured routing for maximum system integrity.
From Ireland to international markets, we deliver complex, high-specification infrastructure with precision, performance, and consistency.
Gloster Global
Landscape House, Baldonnell Business Park, Dublin22, D22 P3K7.
Gloster Global
29 Great Guildford Street, London, SE1 0ES
Gloster Global
Taunusanlage 8, 60329 Frankfurt am Main
To provide sustainable MEP Solutions to a global community with an evolutionary mentality.